GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » PANDA » PandaRoot » Tracking » Update on eta_c reconstruction with STT and TPC
Re: Update on eta_c reconstruction with STT and TPC [message #12156 is a reply to message #12125] Tue, 28 June 2011 13:24 Go to previous messageGo to previous message
StefanoSpataro is currently offline  StefanoSpataro
Messages: 2736
Registered: June 2005
Location: Torino
first-grade participant

From: *to.infn.it
Hi,
I have tried with a different sample, 500 events under eta_c folder, and I have seen:

1966 charged candidates
2865 PndTrackPostFitComplete tracks
2410 PndTrackPostFitComplete with flag>0.
1995 PndTrackPostFitComplete with flag>0. & p>0.1 & p<15

The remaining 1995-1966 missing candidates should be tracks were the back extrapolation to beam axis has failed.

Everything fine to me for what concerns the pidcorrelator.
 
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: Problem with secondary tracks
Next Topic: TpcRiemannTrackingTask - ideal PID now working - please rerun reconstruction
Goto Forum:
  


Current Time: Tue Apr 23 23:58:25 CEST 2024

Total time taken to generate the page: 0.01160 seconds