GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » CBM » CBMROOT » General » Mass production DEC08 with full ECAL
Mass production DEC08 with full ECAL [message #7618] Wed, 10 December 2008 20:19 Go to previous message
Volker Friese is currently offline  Volker Friese
Messages: 365
Registered: April 2004
Location: GSI CBM
first-grade participant
From: *gsi.de
I. Korolko requested a mass production including the full ECAL. This will be done with the release DEC08 (once it is there). It will be the first use case of CBM-GRID. This forum topic is intended to discuss issues related to this production.

Requested are:

  • Minimum 100 k events. This would require about 200 CPU days and about 0.5 TB storage capacity.
  • Maximum 1 M events, requiring 8 CPU years and 5 TB storage.


Production should start before christmas. The participating sites are GSI, Dubna, and potentially ITEP.

Open questions are:
  • What is the geometry to be used?
  • Which reconstruction steps are required?
  • What is the status of CBM-GRID at the participating sites?

 
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: Configuration files outside gconfig directory
Next Topic: Release DEC08
Goto Forum:
  


Current Time: Thu Dec 12 22:31:22 CET 2024

Total time taken to generate the page: 0.00812 seconds