GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » PANDA » PandaRoot » Bugs, Fixes, Releases » Fix in lhetrack
Re: Update of lhetrack [message #6685 is a reply to message #6357] Wed, 07 May 2008 14:03 Go to previous messageGo to previous message
asanchez is currently offline  asanchez
Messages: 350
Registered: March 2006
first-grade participant
From: *gsi.de
Dear all, i have done some modifications in tof
so that the tof detector can be added to lhetrack without problems(it doesn't crashes)

One can operate either with TofPoint or with TofHit.
Of course if one uses the TofPoint the result aftre tracking and fit
is nicer(see picture below) than by using the TofHit information.

To create the hit, i have made some approximation to calculate the
time at each edge of the scintillation bar(as it was measured by a tdc), so basically hit provides the position coordinates of the center of the bar in the xy plane, and the z coordinate is determined by using the time difference (photon arrival time)measured by tdc.

Of course the position resolution will be much worse than
mvd or tpc.

Here you are two pictures in which tofPoint and TofHit was considered respectively.

So i don't know if it is a good idea to add the tof information
to the tracking.

I think that for pid with tof, geane should be used to match the track with tof hits and get the corresponding tof, and then try to calculate the total length.
best regrads
 
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: EmcCluster: Map version 0 does not exist
Next Topic: Update in Dart.sh
Goto Forum:
  


Current Time: Fri Oct 04 13:19:57 CEST 2024

Total time taken to generate the page: 0.00964 seconds