Hi all,
the stt and tpc macros for the DC are now checked in.
pandaroot/macro/dc1
NOTE that infile and outfile are still fixed in the macros.
stt
===
root -b runsim.C"(nEvents,pT)"
root -b rundigi.C
root -b runreco.C
params 1175k+11.7k/event (params really seem to be run dependand)
sim 240k+6.5k/event
digi 10k+10.6k/event
reco 0.3k+0.2k/event
differences to usual svn macros:
o field maps instead of constant field
o nEvents and pT are option parsed in sim
o nEvents is zero (=read all) in digi and reco
Proposal:
pT=30,40,50,...100 MeV/c
pT=100,200,300,...,1000 MeV/c
pT=1,2,3,...,7.5 GeV/c
10,000,000 events each
tpc
===
we will use Stefano's new macros
root -b run_sim_tpcmvd.C"(nEvents,pT)"
root -b run_rectrack_tpcmvd.C
params 43k (params seem to be fixed)
sim 46k+17.4k/event
digi+reco zero kB+39.2k/event
differences to usual svn macros:
o nEvents and pT are option parsed in sim
Proposal:
pT=30,40,50,...100 MeV/c
pT=100,200,300,...,1000 MeV/c
pT=1,2,3,...,7.5 GeV/c
10,000,000 events each
dpm
===
not macros, but here Johan's bash scripts will be used.
however, for Kilian's calculation of disk space:
250 bytes/event
nEvents and beam momenta for dpm will be proposed tomorrow.
cheers, Soeren
|
|
|