GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » Alice » Alice TRD chamber construction » Distribution of chamber types to labs
icon1.gif  Distribution of chamber types to labs [message #269] Fri, 26 March 2004 18:40 Go to previous message
David Emschermann is currently offline  David Emschermann
Messages: 3
Registered: March 2004
occasional visitor
Dear all !

Harry has asked for a plan splitting the 12 different chamber types to the 4 labs involved in construction in 2004. Some chamber types will be listed with a primary and a secondary production site, in which they will be produced in parallel. This ensures the chamber production for all the 3 supermodules will be completed by end of this year.

Number of different ROC types to be built in 2004

DUB	6 : L[1-6]C0
BU	3 : L[1,2,6]C1
GSI	3 : L[3,4,5]C1
HD	6 : L[1-2]C0, L[2-4,6]C1


Primary + Secondary production site overview

	C0		C1
------------------------------------
L6 	DUB 		HD +BU
L5 	DUB 		GSI
L4 	DUB 		GSI+HD
L3 	DUB 		HD +GSI
L2 	DUB+HD 	        BU +HD
L1 	DUB+HD 	        BU


Number of ROCs to be built for 3 SM in primary + secondary sites

        C0              C1
------------------------------------
L6      3 DUB       	 8 HD + 4 BU
L5      3 DUB           12 GSI
L4      3 DUB            4 GSI+ 8 HD
L3      3 DUB            8 HD + 4 GSI
L2      3 DUB + 3 HD     4 BU + 8 HD
L1      3 DUB + 3 HD    12 BU


List of labs participating in construction in 2004,
and minimum number of ROCs built in 2004 for 3 SM + Testbeam

DUB     Dubna		18
BU      Bucharest	20
GSI     Darmstadt	20
HD      Heidelberg	38
		       ----
Total			96 (including 6 chambers for testbeam 2004)


The numbers agree all with the ones presented by Harry on the TRD collaboration meeting at GSI this year. The number of chamber types to be built in every lab may vary in case of unexpected delay in part supply. Repartition of ROC types is not forseen to change in 2004.

Best regards,

David

 
Read Message icon1.gif
Read Message
Previous Topic: Meetings
Next Topic: Gluing table modification
Goto Forum:
  


Current Time: Fri Oct 04 04:57:41 CEST 2024

Total time taken to generate the page: 0.00815 seconds