GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » PANDA » PANDA - Detector » PANDA TOF » PID-TOF subgroup meeting GSI December 2008
PID-TOF subgroup meeting GSI December 2008 [message #7556] Mon, 24 November 2008 12:44 Go to previous message
Carsten Schwarz is currently offline  Carsten Schwarz
Messages: 285
Registered: March 2004
first-grade participant
From: *gsi.de
Dear colleagues,

the PANDA-collaboration meeting at GSI approaches and there is
a PID-TOF subgroup meeting at Monday, Dezember 8th, at 14:00h
in the KP3 seminar room (SB3 4.161).

If you cannot attend the meeting, there will be the possibility
to join by EVO, the password will be fasttiming

If tou intend to give a presentation, please, tell me the time needed and the title.

Although the PID-TOF takes care about forward and target
spectrometer, the main topic is this time the barrel TOF implemented either as RPC or scintillator counter. To remind
you the requirements from the PANDA wiki page
(http://panda-wiki.gsi.de/cgi-bin/viewauth/Tof/WebHome):

Finding the detector requirements from the physical program is the task of the PID-TAG group. See there for details.

Timing information for the target spectrometer is helpful for PID and for cleaning up of events. For the first an excellent
time resolution in the order of 100 ps is needed, while for
the latter a relaxed timing resolution of about 1 ns is sufficient.

The material budget should be kept as low as possible in
order not produce too many electron showers. Theses showers deteriorate the electron-pion separation capabilities of the EMC. The barrel DIRC has an (perpendicular) radiation length of 17% and causes in forward direction up to 30% of showers. 50% of these showers can be identified in the DIRC itself by detection of ambient light in addition to the directed Cherenkov photons. These numbers indicate a upper threshold of the TOF material budget of 10% and less.

My best regards,
Carsten Schwarz







 
Read Message
Read Message
Read Message
Previous Topic: PID-TOF subgroup meeting in Ferrara September 2008
Next Topic: PANDA PID-TOF subgroup meeting, March09, GSI
Goto Forum:
  


Current Time: Sat Nov 09 09:00:27 CET 2024

Total time taken to generate the page: 0.00469 seconds