GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » NUSTAR » NUSTAR PRESPEC » Position calculations on start/stop scintillators
Re: Position calculations on start/stop scintillators [message #18217 is a reply to message #18212] Wed, 13 May 2015 10:56 Go to previous messageGo to previous message
thuyuk is currently offline  thuyuk
Messages: 68
Registered: July 2014
continuous participant

From: *ific.uv.es
Hi Michael,

thank you very much for your comments.

Would it be enough to run the minimum search algorithm inside CircularMembraneScintillator.cpp which has been implemented for the cases where there are no valid signals from the reference hit point in DSSSD or in TPC, by assuming all the reference signals are not valid?

Cheers,
Tayfun
 
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: PRESPEC GEANT
Next Topic: FRS Calibration Issue
Goto Forum:
  


Current Time: Thu Mar 28 21:02:29 CET 2024

Total time taken to generate the page: 0.01176 seconds