GSI Forum
GSI Helmholtzzentrum für Schwerionenforschung

Home » PANDA » PandaRoot » Tracking » Official code for tracking TDR
Re: Official code for tracking TDR [message #11733 is a reply to message #11720] Tue, 03 May 2011 11:35 Go to previous messageGo to previous message
StefanoSpataro is currently offline  StefanoSpataro
Messages: 2736
Registered: June 2005
Location: Torino
first-grade participant

From: *to.infn.it
Dear all,
I have put into macro/run/tdrct the full chain that should be run for the signal production for STT.
The list is in README_STT.TXT, and consists in macros in the following order:

BG sim + digi
run_sim_stt_dpm.C
run_digi_stt_dpm.C


SIGNAL sim + digi
run_sim_stt_evt.C
run_digi_stt_evt.C


Mixing and reconstruction:
run_reco_stt_mix.C
run_pid_stt_mix.C


I have used a dummy .dec file and a dummy pbar momentum, you should modify the values as you need.

I would like to ask experts to take a look, to check if I am forgetting something or not.
I would like to have also the task list for TPC, to prepare such kind of macros.


Few comments from my side:

  • Sim and Digi could be run in the same macro, in order to save disk space and to not store the points. Unfortunately Mvd and Stt digi tasks do not allow this (while emc does), if you run digitization together with simulation you have crashes.
  • In theory reco ad pid could run on the same level, if needed
  • If you think some data objects could be removed from the file, just tell me. if you think that it would be better to switch off something, i.e. PID detectors, just tell me and we can discuss
  • I have added also FTS geometry. If requested, Ralf ideal track finder for forward spectrometer could be added, if stable enough


I think for the moment is over, I wait for comments and remarks.


 
Read Message icon4.gif
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: Reconstruction macro crash with may11 release
Next Topic: Simulation campaign for central tracker TDR
Goto Forum:
  


Current Time: Fri Mar 29 14:25:12 CET 2024

Total time taken to generate the page: 0.00932 seconds